{"id":30816,"date":"2018-10-24T14:07:05","date_gmt":"2018-10-24T18:07:05","guid":{"rendered":"https:\/\/www.pmvision.ca\/?p=30816"},"modified":"2018-10-25T10:57:16","modified_gmt":"2018-10-25T14:57:16","slug":"wbs-codes-in-microsoft-project-2019","status":"publish","type":"post","link":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/","title":{"rendered":"WBS Codes in Microsoft Project 2019"},"content":{"rendered":"<h2><strong><span style=\"color: #008080;\">What is A Work Breakdown Structure (WBS)?<\/span> <\/strong><\/h2>\n<p>A Work Breakdown Structure (WBS) is the hierarchical mapping of a project showing the tasks that must be completed in order to deliver on the project. Each level in the WBS and each task within each level is identified by a unique WBS code.<\/p>\n<p>In simple terms a WBS is an outline or map of the specific project. The WBS starts with the project as the top level deliverable and is further broken down into a hierarchy of sub-deliverables.<\/p>\n<h2><\/h2>\n<h2><strong><span style=\"color: #008080;\">Example of\u00a0 A Work Breakdown Structure (WBS)?<\/span><\/strong><\/h2>\n<p>The following is a sample WBS for a house construction project, where the\u00a0 finished house is the major deliverable. To complete\u00a0 the house, sub-deliverables are identified which are\u00a0 further decomposed until a single person or group\u00a0 can be assigned to complete the task.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg\" target=\"_blank\" rel=\"noopener\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-30825 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?resize=442%2C244\" alt=\"WBS Example\" width=\"442\" height=\"244\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?w=442&amp;ssl=1 442w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?resize=150%2C83&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?resize=300%2C166&amp;ssl=1 300w\" sizes=\"(max-width: 442px) 100vw, 442px\" \/><\/a><\/p>\n<blockquote><p><strong><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/microsoft-project-training-courses-toronto\/\" target=\"_blank\" rel=\"noopener\">Learn MS.Project 2019\u00a0 Fundamentals in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/strong><\/p>\n<p><strong><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/advanced-microsoft-project-training-course\/\" target=\"_blank\" rel=\"noopener\">Learn Advanced Techniques in MS.Project 2019 in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/strong><\/p><\/blockquote>\n<h2><\/h2>\n<h2><strong><span style=\"color: #008080;\">WBS Codes<\/span><\/strong><\/h2>\n<p>WBS codes are the codes that are used to number the tasks in the project.\u00a0 By default, Microsoft Project automatically generates outline numbers for each task you create and stores these in the <strong><em>Outline Number <\/em><\/strong>field. Microsoft Project also has a <strong><em>WBS <\/em><\/strong>field, which in its default state, is equivalent to the <strong><em>Outline Number <\/em><\/strong>field. Both of these default fields are shown in the table below.<\/p>\n<div id=\"attachment_30818\" style=\"width: 645px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Codes-in-Microsoft-Project-2016.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30818\" class=\"size-full wp-image-30818\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Codes-in-Microsoft-Project-2016.jpg?resize=635%2C302\" alt=\"WBS Codes in Microsoft Project 2016\" width=\"635\" height=\"302\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Codes-in-Microsoft-Project-2016.jpg?w=635&amp;ssl=1 635w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Codes-in-Microsoft-Project-2016.jpg?resize=150%2C71&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Codes-in-Microsoft-Project-2016.jpg?resize=300%2C143&amp;ssl=1 300w\" sizes=\"(max-width: 635px) 100vw, 635px\" \/><\/a><p id=\"caption-attachment-30818\" class=\"wp-caption-text\">WBS Codes in Microsoft Project 2016<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>If your organisation has defined its own WBS numbering schema, you can create and use custom WBS codes by entering your company\u2019s WBS format rules in the WBS mask.<\/p>\n<p>If a <strong><em>work package <\/em><\/strong>(that is, a summary task and its list of tasks needed to produce the specific unit of work) is moved in the schedule, Microsoft Project will automatically renumber the WBS codes that are assigned to these tasks so that the top level numbers remain consecutive in the schedule. If you do not want Microsoft Project renumbering these codes, you will need to create and use <strong><em>custom WBS codes<\/em><\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<h2><span style=\"color: #008080;\"><strong>Creating WBS Codes<\/strong><\/span><\/h2>\n<p class=\"Default\">If your company has a WBS numbering schema, you can create custom WBS codes instead of using MS.Project\u2019s default codes. To create custom WBS codes you can customise the WBS code format by using the WBS code mask. The mask contains numbers or characters for each outline level with separators between the levels.<\/p>\n<p>1- Click on the <strong><em>View <\/em><\/strong>tab, click <strong><em>Tables <\/em><\/strong>in the <strong><em>Data <\/em><\/strong>group and ensure <strong>Entry <\/strong>is selected<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-30819\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=1024%2C208\" alt=\"Creating WBS Codes in Microsoft Project 2016 -2\" width=\"1024\" height=\"208\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=1024%2C208&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=150%2C30&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=300%2C61&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=768%2C156&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=1080%2C219&amp;ssl=1 1080w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?resize=800%2C162&amp;ssl=1 800w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-2.jpg?w=1143&amp;ssl=1 1143w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>2- Click on the <strong><em>Project <\/em><\/strong>tab, then click on <strong><em>WBS <\/em><\/strong>in the <strong><em>Properties <\/em><\/strong>group and select <strong>Define Code <\/strong>to display the <strong><em>WBS Code Definition <\/em><\/strong>dialog box<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-30821\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=1024%2C171\" alt=\"Creating WBS Codes in Microsoft Project 2016 -3\" width=\"1024\" height=\"171\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=1024%2C171&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=150%2C25&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=300%2C50&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=768%2C128&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=1080%2C180&amp;ssl=1 1080w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?resize=800%2C134&amp;ssl=1 800w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-3.jpg?w=1161&amp;ssl=1 1161w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong><em>WBS Code Definition <\/em><\/strong>dialog box<\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-1.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-30820\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-1.jpg?resize=618%2C316\" alt=\"Creating WBS Codes in Microsoft Project 2016 -1\" width=\"618\" height=\"316\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-1.jpg?w=618&amp;ssl=1 618w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-1.jpg?resize=150%2C77&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-1.jpg?resize=300%2C153&amp;ssl=1 300w\" sizes=\"(max-width: 618px) 100vw, 618px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>3- Type <strong>B <\/strong>in <strong><em>Project Code Prefix\u00a0 ( <\/em><\/strong><em>Let\u2019s assume we\u2019re building four houses (A-D) and this is the second house so we\u2019ll prefix all codes with B\u2026)<\/em><\/p>\n<p>4- Click in the first <strong><em>Sequence <\/em><\/strong>field, click on the drop arrow and select <strong>Uppercase Letters (ordered)<\/strong>, then select the dash symbol in <strong><em>Separator<\/em><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-size: 10.0pt;\"><b><i>\u00a0<\/i><\/b><\/span><\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-4.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-30822\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-4.jpg?resize=393%2C316\" alt=\"Creating WBS Codes in Microsoft Project 2016 -4\" width=\"393\" height=\"316\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-4.jpg?w=393&amp;ssl=1 393w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-4.jpg?resize=150%2C121&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-4.jpg?resize=300%2C241&amp;ssl=1 300w\" sizes=\"(max-width: 393px) 100vw, 393px\" \/><\/a><\/p>\n<p><em>You can have Microsoft Project generate new WBS codes for new tasks by selecting the first option( Generate WBS code for new task) . Selecting the second option ( Verify uniqueness of new WBS codes) gets Microsoft Project to verify the uniqueness of manually entered WBS codes as they are entered.<\/em><\/p>\n<p>&nbsp;<\/p>\n<p>5- Repeat step<strong> <em>4 <\/em><\/strong>to create <strong><em>Level 2 <\/em><\/strong>as shown, ensure the two check boxes appear ticked, then click on <strong>[OK] .<\/strong><\/p>\n<p><em>Let\u2019s insert the WBS column: Right-click on the\u00a0 <strong>Outline Number <\/strong>column header, click on <strong>Insert Column<\/strong>, type <strong>w <\/strong>then click on <strong>WBS <\/strong>to insert this field<\/em><\/p>\n<p class=\"Default\"><i><span style=\"font-size: 10.0pt;\">\u00a0<\/span><\/i><\/p>\n<p><a href=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-5.jpg\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-30823\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-5.jpg?resize=541%2C247\" alt=\"Creating WBS Codes in Microsoft Project 2016 -5\" width=\"541\" height=\"247\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-5.jpg?w=541&amp;ssl=1 541w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-5.jpg?resize=150%2C68&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/Creating-WBS-Codes-in-Microsoft-Project-2016-5.jpg?resize=300%2C137&amp;ssl=1 300w\" sizes=\"(max-width: 541px) 100vw, 541px\" \/><\/a><\/p>\n<p>Our custom WBS codes have been automatically generated<\/p>\n<p class=\"Default\"><strong><span style=\"font-size: 10.0pt;\">\u00a0<\/span><\/strong><\/p>\n<blockquote><p><strong><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/microsoft-project-training-courses-toronto\/\" target=\"_blank\" rel=\"noopener\">Take our MS.Project 2019 Fundamentals Training Class in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/strong><\/p>\n<p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/advanced-microsoft-project-training-course\/\" target=\"_blank\" rel=\"noopener\"><strong>Take our Advanced MS.Project 2019 Training Courses in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/strong><\/a><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>What is A Work Breakdown Structure (WBS)? A Work Breakdown Structure (WBS) is the hierarchical mapping of a project showing the tasks that must be completed in order to deliver on the project. Each level in the WBS and each task within each level is identified by a unique WBS code. In simple terms a [&hellip;]<\/p>\n","protected":false},"author":354,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[65,18],"tags":[],"class_list":["post-30816","post","type-post","status-publish","format-standard","hentry","category-ms-project","category-pm"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>WBS Codes in Microsoft Project 2019<\/title>\n<meta name=\"description\" content=\"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"WBS Codes in Microsoft Project 2019\" \/>\n<meta property=\"og:description\" content=\"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/\" \/>\n<meta property=\"og:site_name\" content=\"PMVISION Global\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pmvisioninc\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-24T18:07:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-10-25T14:57:16+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pmvisioninc\" \/>\n<meta name=\"twitter:site\" content=\"@pmvisioninc\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"WBS Codes in Microsoft Project 2019\",\"datePublished\":\"2018-10-24T18:07:05+00:00\",\"dateModified\":\"2018-10-25T14:57:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/\"},\"wordCount\":646,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/WBS-Example-1.jpg\",\"articleSection\":[\"MS.Project\",\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/\",\"name\":\"WBS Codes in Microsoft Project 2019\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/WBS-Example-1.jpg\",\"datePublished\":\"2018-10-24T18:07:05+00:00\",\"dateModified\":\"2018-10-25T14:57:16+00:00\",\"description\":\"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/WBS-Example-1.jpg?fit=442%2C244&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/WBS-Example-1.jpg?fit=442%2C244&ssl=1\",\"width\":442,\"height\":244},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/wbs-codes-in-microsoft-project-2019\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"WBS Codes in Microsoft Project 2019\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#website\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\",\"name\":\"PMVISION Global\",\"description\":\"Affordable Training, Global Reach\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\",\"name\":\"PMVISION\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo6.png?fit=418%2C114&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo6.png?fit=418%2C114&ssl=1\",\"width\":418,\"height\":114,\"caption\":\"PMVISION\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/pmvisioninc\",\"https:\\\/\\\/x.com\\\/pmvisioninc\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pmvision\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCKPT0nmE4Dnf2kFy--Sg5gg\\\/videos\u200e\"]},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/author\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"WBS Codes in Microsoft Project 2019","description":"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/","og_locale":"en_US","og_type":"article","og_title":"WBS Codes in Microsoft Project 2019","og_description":"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.","og_url":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/","og_site_name":"PMVISION Global","article_publisher":"https:\/\/www.facebook.com\/pmvisioninc","article_published_time":"2018-10-24T18:07:05+00:00","article_modified_time":"2018-10-25T14:57:16+00:00","og_image":[{"url":"http:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_creator":"@pmvisioninc","twitter_site":"@pmvisioninc","twitter_misc":{"Written by":"","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#article","isPartOf":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/"},"author":{"name":"","@id":""},"headline":"WBS Codes in Microsoft Project 2019","datePublished":"2018-10-24T18:07:05+00:00","dateModified":"2018-10-25T14:57:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/"},"wordCount":646,"publisher":{"@id":"https:\/\/www.pmvision.ca\/global\/#organization"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#primaryimage"},"thumbnailUrl":"http:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg","articleSection":["MS.Project","Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/","url":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/","name":"WBS Codes in Microsoft Project 2019","isPartOf":{"@id":"https:\/\/www.pmvision.ca\/global\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#primaryimage"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#primaryimage"},"thumbnailUrl":"http:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg","datePublished":"2018-10-24T18:07:05+00:00","dateModified":"2018-10-25T14:57:16+00:00","description":"In this article we will teach you how to create custom WBS codes instead of using Micrososft Project\u2019s default codes.","breadcrumb":{"@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#primaryimage","url":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?fit=442%2C244&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2018\/10\/WBS-Example-1.jpg?fit=442%2C244&ssl=1","width":442,"height":244},{"@type":"BreadcrumbList","@id":"https:\/\/www.pmvision.ca\/global\/wbs-codes-in-microsoft-project-2019\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pmvision.ca\/global\/"},{"@type":"ListItem","position":2,"name":"WBS Codes in Microsoft Project 2019"}]},{"@type":"WebSite","@id":"https:\/\/www.pmvision.ca\/global\/#website","url":"https:\/\/www.pmvision.ca\/global\/","name":"PMVISION Global","description":"Affordable Training, Global Reach","publisher":{"@id":"https:\/\/www.pmvision.ca\/global\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pmvision.ca\/global\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pmvision.ca\/global\/#organization","name":"PMVISION","url":"https:\/\/www.pmvision.ca\/global\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/www.pmvision.ca\/wp-content\/uploads\/2015\/07\/logo6.png?fit=418%2C114&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/wp-content\/uploads\/2015\/07\/logo6.png?fit=418%2C114&ssl=1","width":418,"height":114,"caption":"PMVISION"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pmvisioninc","https:\/\/x.com\/pmvisioninc","https:\/\/www.linkedin.com\/company\/pmvision","https:\/\/www.youtube.com\/channel\/UCKPT0nmE4Dnf2kFy--Sg5gg\/videos\u200e"]},{"@type":"Person","@id":"","url":"https:\/\/www.pmvision.ca\/global\/author\/"}]}},"jetpack_shortlink":"https:\/\/wp.me\/phsz9t-812","jetpack_sharing_enabled":true,"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts\/30816","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/users\/354"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/comments?post=30816"}],"version-history":[{"count":0,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts\/30816\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/media?parent=30816"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/categories?post=30816"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/tags?post=30816"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}