{"id":3224,"date":"2015-08-30T08:44:27","date_gmt":"2015-08-30T12:44:27","guid":{"rendered":"https:\/\/www.pmvision.ca\/?p=3224"},"modified":"2018-12-15T00:47:39","modified_gmt":"2018-12-15T04:47:39","slug":"ms-project-2013-the-basics-part-2","status":"publish","type":"post","link":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/","title":{"rendered":"MS.Project 2013: The Basics &#8220;Part 2&#8221;"},"content":{"rendered":"<h2><span style=\"text-decoration: underline;\">Creating Relationships Between Tasks<\/span><\/h2>\n<p>A network of tasks in a project must be connecting activities from the start to the end, to establish these relationship we need to use the field \u201cPredecessors\u201d of each task, where we can designate which activity will be preceding the one we are updating, in the example below we will indicate MS project that \u201cActivity 5\u201d can start once \u201cActivity 4\u201d is completed (Finish to Start relationship).<\/p>\n<div id=\"attachment_3225\" style=\"width: 417px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3225\" class=\"size-full wp-image-3225\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?resize=407%2C148\" alt=\".\" width=\"407\" height=\"148\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?w=407&amp;ssl=1 407w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?resize=150%2C55&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?resize=300%2C109&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?resize=157%2C57&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/7.png?resize=400%2C145&amp;ssl=1 400w\" sizes=\"(max-width: 407px) 100vw, 407px\" \/><p id=\"caption-attachment-3225\" class=\"wp-caption-text\">Activities<\/p><\/div>\n<p>Notice that by establishing the relationship now the Group 1 takes 2 days to be completed, because before, the activities were set to be performed in parallel, and now they are in series (Finish to Start relationship) Note: MS project will calculate dates based on the durations of the tasks, their relationships and the start date set for the project, however it is possible to change the starting date of a task (if necessary) By double clicking on a Task or milestone, and using the fields related to the dates (Start or Finish).<\/p>\n<blockquote><p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/microsoft-project-training-courses-toronto\/\" target=\"_blank\" rel=\"noopener\">Learn MS.Project 2016\u00a0 Fundamentals in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p>\n<p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/advanced-microsoft-project-training-course\/\" target=\"_blank\" rel=\"noopener\">Learn Advanced Techniques in MS.Project 2016\u00a0 in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p><\/blockquote>\n<h2><\/h2>\n<h2><span style=\"text-decoration: underline;\">Assigning Resources to Tasks<\/span><\/h2>\n<p>You can use the Resource Sheet in Microsoft Project to create a list of the people, equipment, and material resources that make up your team and carry out the project tasks. Your resource list will consist of work resources or material resources. Work resources are people or equipment; material resources are consumable materials or supplies, such as concrete, wood, or nails.<\/p>\n<p style=\"padding-left: 30px;\">1.On the View menu, click Resource Sheet.<br \/>\n2. On the View menu, point to Table, and then click Entry.<br \/>\n3. In the Resource Name field, type a resource name.<br \/>\n4. You can go through the fields in the sheet, but for the simplicity of the example just focus on the name and initials of the Resource<br \/>\n5. Below is an example of some Human resources added to the Resource Sheet (We could add also other type of resources such as Equipments, Consumables, etc.)<\/p>\n<div id=\"attachment_3242\" style=\"width: 521px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3242\" class=\"size-full wp-image-3242\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=511%2C125\" alt=\"Assigning Resources\" width=\"511\" height=\"125\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?w=511&amp;ssl=1 511w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=150%2C37&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=300%2C73&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=157%2C38&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=400%2C98&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/9.png?resize=500%2C122&amp;ssl=1 500w\" sizes=\"(max-width: 511px) 100vw, 511px\" \/><p id=\"caption-attachment-3242\" class=\"wp-caption-text\">Assigning Resources<\/p><\/div>\n<p style=\"padding-left: 30px;\">6. Once the resources are created, you can go back to the View menu, and click Gantt Chart to see again<br \/>\nthe tasks, and then when you double click a task you can add a resource to this task by using the tab<br \/>\n\u201cResources\u201d<\/p>\n<p>Note: The main goal of the resource assignment is to allocate properly the resources and to provide valuable information regarding the effort of the team.<\/p>\n<h2><span style=\"text-decoration: underline;\">Find Critical Path<\/span><\/h2>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Critical Path Analysis (CPA) helps you to lay out all tasks that must be completed as part of a project.<\/li>\n<li>CPA helps you to identify the minimum length of time needed to complete a project<\/li>\n<li>For finding CP list all the activities and enter early start, late, start, early finish and late finish info of all the activities.<\/li>\n<li>You can do this under insert\/columns and selecting each terms.<\/li>\n<li>Following screen shot demonstrates how to insert.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>Project automatically calculates ES, EF, LS and LF based on the starting\/ending dates you have provided.<\/p>\n<ol type=\"1\">\n<li>Click<span class=\"Apple-converted-space\">\u00a0<\/span><b class=\"ocpUI\">View<\/b><span class=\"Apple-converted-space\">\u00a0<\/span>&gt;<span class=\"Apple-converted-space\">\u00a0<\/span><b class=\"ocpUI\">Gantt Chart<\/b>.<\/li>\n<li>Click<span class=\"Apple-converted-space\">\u00a0<\/span><b class=\"ocpUI\">Format<\/b>, and then select the<span class=\"Apple-converted-space\">\u00a0<\/span><b class=\"ocpUI\">Critical Tasks<\/b><span class=\"Apple-converted-space\">\u00a0<\/span>check box.<\/li>\n<\/ol>\n<div id=\"attachment_3274\" style=\"width: 338px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3274\" class=\"wp-image-3274 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/cpm1.png?resize=328%2C271\" alt=\"\" width=\"328\" height=\"271\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/cpm1.png?w=328&amp;ssl=1 328w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/cpm1.png?resize=150%2C124&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/cpm1.png?resize=300%2C248&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/cpm1.png?resize=157%2C130&amp;ssl=1 157w\" sizes=\"(max-width: 328px) 100vw, 328px\" \/><p id=\"caption-attachment-3274\" class=\"wp-caption-text\">Critical Path<\/p><\/div>\n<p>&nbsp;<\/p>\n<h2><span style=\"text-decoration: underline;\">Showing Critical Path in other task views<\/span><\/h2>\n<ul>\n<li>You can show the critical path in multiple ways. You can show critical path using Gantt chart, Detailed Gantt, Network Diagram, and showing only critical tasks.<\/li>\n<li>The following images has screenshots of how to show critical path using various methods:<\/li>\n<li>In Gantt Chart click on Gantt Chart wizard and choose critical path and follow the steps.<\/li>\n<\/ul>\n<div id=\"attachment_3266\" style=\"width: 1191px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3266\" class=\"wp-image-3266 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=1080%2C645\" alt=\"\" width=\"1080\" height=\"645\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?w=1181&amp;ssl=1 1181w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=150%2C90&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=300%2C179&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=768%2C458&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=1024%2C611&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=157%2C94&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=400%2C239&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=500%2C298&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/GC1.png?resize=1080%2C645&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3266\" class=\"wp-caption-text\">Gantt Chart<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li>In Detailed Gantt click on View &#8212;&#8211;&gt;More Views&#8212;-&gt; Detail Gantt-\u00a0\u00a0 Apply. It shows the critical path with slack time.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<div id=\"attachment_3267\" style=\"width: 1152px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3267\" class=\"wp-image-3267 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1080%2C670\" alt=\"\" width=\"1080\" height=\"670\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?w=1142&amp;ssl=1 1142w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=150%2C93&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=300%2C186&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=768%2C476&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1024%2C635&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=157%2C97&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=400%2C248&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=500%2C310&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1080%2C670&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3267\" class=\"wp-caption-text\">Detail Gantt<\/p><\/div>\n<p>&nbsp;<\/p>\n<ul>\n<li>In Network Diagram click on View\u00a0 &#8211;&gt;More Views &#8211;&gt; Network Diagram &#8211;&gt;Apply.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<div id=\"attachment_3269\" style=\"width: 1168px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3269\" class=\"wp-image-3269 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=1080%2C607\" alt=\"\" width=\"1080\" height=\"607\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?w=1158&amp;ssl=1 1158w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=150%2C84&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=300%2C169&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=768%2C432&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=1024%2C576&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=157%2C88&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=400%2C225&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=500%2C281&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Network-Diagram.png?resize=1080%2C607&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3269\" class=\"wp-caption-text\">Critical Path<\/p><\/div>\n<ul>\n<li>For showing only the critical tasks, click on Gantt Chart&#8211;&gt;filter&#8211;&gt;Critical.<\/li>\n<\/ul>\n<div id=\"attachment_3270\" style=\"width: 1165px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3270\" class=\"wp-image-3270 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=1080%2C639\" alt=\"\" width=\"1080\" height=\"639\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?w=1155&amp;ssl=1 1155w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=150%2C89&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=300%2C177&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=768%2C454&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=1024%2C606&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=157%2C93&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=400%2C237&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=500%2C296&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Critical-Path.png?resize=1080%2C639&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3270\" class=\"wp-caption-text\">Critical Path<\/p><\/div>\n<p>&nbsp;<\/p>\n<blockquote><p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/microsoft-project-training-courses-toronto\/\" target=\"_blank\" rel=\"noopener\">Take our MS.Project 2016 Fundamentals Training Class in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p>\n<p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/advanced-microsoft-project-training-course\/\" target=\"_blank\" rel=\"noopener\">Take our Advanced MS.Project 2016\u00a0Training Courses in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p><\/blockquote>\n<h2><\/h2>\n<h2><span style=\"text-decoration: underline;\">Slack Time For Scheduling<\/span><\/h2>\n<ul>\n<li>For viewing the schedule showing the slack go to Views &#8212;-&gt; More views &#8212;-&gt; Detailed Gantt view &#8212;-&gt;Apply.<\/li>\n<li>In this click on View\u00a0&#8212;-&gt; Table\u00a0 &#8212;-&gt; Schedule<\/li>\n<li>Slack appears as thin bars to the right of a task, with slack values adjoining the regular Gantt bars<\/li>\n<li>You can also view the free slack and total slack of a task in the sheet.<\/li>\n<li>You can move the activity within the available slack time, to balance the resources, in the cases where over allocation is present.<\/li>\n<\/ul>\n<div id=\"attachment_3267-2\" style=\"width: 1152px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3267-2\" class=\"wp-image-3267 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1080%2C670\" alt=\"\" width=\"1080\" height=\"670\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?w=1142&amp;ssl=1 1142w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=150%2C93&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=300%2C186&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=768%2C476&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1024%2C635&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=157%2C97&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=400%2C248&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=500%2C310&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Detail-Gantt.png?resize=1080%2C670&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3267-2\" class=\"wp-caption-text\">Detail Gantt<\/p><\/div>\n<div id=\"attachment_3272\" style=\"width: 1170px\" class=\"wp-caption aligncenter\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3272\" class=\"wp-image-3272 size-full\" src=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=1080%2C656\" alt=\"\" width=\"1080\" height=\"656\" srcset=\"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?w=1160&amp;ssl=1 1160w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=150%2C91&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=300%2C182&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=768%2C467&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=1024%2C622&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=157%2C95&amp;ssl=1 157w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=400%2C243&amp;ssl=1 400w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=500%2C304&amp;ssl=1 500w, https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/Schedule-Table-View.png?resize=1080%2C656&amp;ssl=1 1080w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><p id=\"caption-attachment-3272\" class=\"wp-caption-text\">Schedule Table View<\/p><\/div>\n<p>Then next article&#8221; PART 3&#8243; Will be a step by step example<\/p>\n<p>Go to <span style=\"color: #3366ff;\"><a style=\"color: #3366ff;\" href=\"http:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-1\/\" target=\"_blank\" rel=\"noopener\">MS.Project 2013: The Basics \u201cPart 1\u2033<\/a><\/span><\/p>\n<blockquote><p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/microsoft-project-training-courses-toronto\/\" target=\"_blank\" rel=\"noopener\">Take our MS.Project 2016 Fundamentals Training Class in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p>\n<p><a href=\"http:\/\/www.pmvision.ca\/global\/shop\/advanced-microsoft-project-training-course\/\" target=\"_blank\" rel=\"noopener\">Take our Advanced MS.Project 2016\u00a0Training Courses in Toronto, Mississauga, Scarborough, Ottawa, &amp; Montreal<\/a><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Step by step to manage projects using Microsoft Project  Part 2<\/p>\n","protected":false},"author":365,"featured_media":3236,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[65,18],"tags":[],"class_list":["post-3224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ms-project","category-pm"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Microsoft Project<\/title>\n<meta name=\"description\" content=\"Managing projects using Microsoft Project\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Microsoft Project\" \/>\n<meta property=\"og:description\" content=\"Managing projects using Microsoft Project\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/\" \/>\n<meta property=\"og:site_name\" content=\"PMVISION Global\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pmvisioninc\" \/>\n<meta property=\"article:published_time\" content=\"2015-08-30T12:44:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-12-15T04:47:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"500\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nawras Khaled\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@pmvisioninc\" \/>\n<meta name=\"twitter:site\" content=\"@pmvisioninc\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nawras Khaled\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/\"},\"author\":{\"name\":\"Nawras Khaled\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/person\\\/66c28e8d74113fdd041c9a5112576ebc\"},\"headline\":\"MS.Project 2013: The Basics &#8220;Part 2&#8221;\",\"datePublished\":\"2015-08-30T12:44:27+00:00\",\"dateModified\":\"2018-12-15T04:47:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/\"},\"wordCount\":885,\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/msp1.jpg?fit=500%2C300&ssl=1\",\"articleSection\":[\"MS.Project\",\"Project Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/\",\"name\":\"Microsoft Project\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/msp1.jpg?fit=500%2C300&ssl=1\",\"datePublished\":\"2015-08-30T12:44:27+00:00\",\"dateModified\":\"2018-12-15T04:47:39+00:00\",\"description\":\"Managing projects using Microsoft Project\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/msp1.jpg?fit=500%2C300&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/global\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/msp1.jpg?fit=500%2C300&ssl=1\",\"width\":500,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/ms-project-2013-the-basics-part-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MS.Project 2013: The Basics &#8220;Part 2&#8221;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#website\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\",\"name\":\"PMVISION Global\",\"description\":\"Affordable Training, Global Reach\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#organization\",\"name\":\"PMVISION\",\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo6.png?fit=418%2C114&ssl=1\",\"contentUrl\":\"https:\\\/\\\/i0.wp.com\\\/www.pmvision.ca\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/logo6.png?fit=418%2C114&ssl=1\",\"width\":418,\"height\":114,\"caption\":\"PMVISION\"},\"image\":{\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/pmvisioninc\",\"https:\\\/\\\/x.com\\\/pmvisioninc\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pmvision\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCKPT0nmE4Dnf2kFy--Sg5gg\\\/videos\u200e\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/#\\\/schema\\\/person\\\/66c28e8d74113fdd041c9a5112576ebc\",\"name\":\"Nawras Khaled\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g\",\"caption\":\"Nawras Khaled\"},\"url\":\"https:\\\/\\\/www.pmvision.ca\\\/global\\\/author\\\/nawraskh\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Microsoft Project","description":"Managing projects using Microsoft Project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/","og_locale":"en_US","og_type":"article","og_title":"Microsoft Project","og_description":"Managing projects using Microsoft Project","og_url":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/","og_site_name":"PMVISION Global","article_publisher":"https:\/\/www.facebook.com\/pmvisioninc","article_published_time":"2015-08-30T12:44:27+00:00","article_modified_time":"2018-12-15T04:47:39+00:00","og_image":[{"width":500,"height":300,"url":"https:\/\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg","type":"image\/jpeg"}],"author":"Nawras Khaled","twitter_card":"summary_large_image","twitter_creator":"@pmvisioninc","twitter_site":"@pmvisioninc","twitter_misc":{"Written by":"Nawras Khaled","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#article","isPartOf":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/"},"author":{"name":"Nawras Khaled","@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/person\/66c28e8d74113fdd041c9a5112576ebc"},"headline":"MS.Project 2013: The Basics &#8220;Part 2&#8221;","datePublished":"2015-08-30T12:44:27+00:00","dateModified":"2018-12-15T04:47:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/"},"wordCount":885,"publisher":{"@id":"https:\/\/www.pmvision.ca\/global\/#organization"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg?fit=500%2C300&ssl=1","articleSection":["MS.Project","Project Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/","url":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/","name":"Microsoft Project","isPartOf":{"@id":"https:\/\/www.pmvision.ca\/global\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#primaryimage"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg?fit=500%2C300&ssl=1","datePublished":"2015-08-30T12:44:27+00:00","dateModified":"2018-12-15T04:47:39+00:00","description":"Managing projects using Microsoft Project","breadcrumb":{"@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#primaryimage","url":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg?fit=500%2C300&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg?fit=500%2C300&ssl=1","width":500,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.pmvision.ca\/global\/ms-project-2013-the-basics-part-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pmvision.ca\/global\/"},{"@type":"ListItem","position":2,"name":"MS.Project 2013: The Basics &#8220;Part 2&#8221;"}]},{"@type":"WebSite","@id":"https:\/\/www.pmvision.ca\/global\/#website","url":"https:\/\/www.pmvision.ca\/global\/","name":"PMVISION Global","description":"Affordable Training, Global Reach","publisher":{"@id":"https:\/\/www.pmvision.ca\/global\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pmvision.ca\/global\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pmvision.ca\/global\/#organization","name":"PMVISION","url":"https:\/\/www.pmvision.ca\/global\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/logo\/image\/","url":"https:\/\/i0.wp.com\/www.pmvision.ca\/wp-content\/uploads\/2015\/07\/logo6.png?fit=418%2C114&ssl=1","contentUrl":"https:\/\/i0.wp.com\/www.pmvision.ca\/wp-content\/uploads\/2015\/07\/logo6.png?fit=418%2C114&ssl=1","width":418,"height":114,"caption":"PMVISION"},"image":{"@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pmvisioninc","https:\/\/x.com\/pmvisioninc","https:\/\/www.linkedin.com\/company\/pmvision","https:\/\/www.youtube.com\/channel\/UCKPT0nmE4Dnf2kFy--Sg5gg\/videos\u200e"]},{"@type":"Person","@id":"https:\/\/www.pmvision.ca\/global\/#\/schema\/person\/66c28e8d74113fdd041c9a5112576ebc","name":"Nawras Khaled","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/33faffc223cb61d6134631c280a50816395372322081fdd163c66ccb684767df?s=96&r=g","caption":"Nawras Khaled"},"url":"https:\/\/www.pmvision.ca\/global\/author\/nawraskh\/"}]}},"jetpack_shortlink":"https:\/\/wp.me\/phsz9t-Q0","jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.pmvision.ca\/global\/wp-content\/uploads\/2015\/07\/msp1.jpg?fit=500%2C300&ssl=1","_links":{"self":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts\/3224","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/users\/365"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/comments?post=3224"}],"version-history":[{"count":0,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/posts\/3224\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/media\/3236"}],"wp:attachment":[{"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/media?parent=3224"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/categories?post=3224"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pmvision.ca\/global\/wp-json\/wp\/v2\/tags?post=3224"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}